Open Access   Article Go Back

A Fuzzy based Fishbone Method for Goal-Oriented Requirements Analysis

Jameela Bano1 , L. S. S. Reddy2 , Hedi Khammari3

Section:Review Paper, Product Type: Journal Paper
Volume-6 , Issue-9 , Page no. 699-704, Sep-2018

CrossRef-DOI:   https://doi.org/10.26438/ijcse/v6i9.699704

Online published on Sep 30, 2018

Copyright © Jameela Bano, L. S. S. Reddy, Hedi Khammari . This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

View this paper at   Google Scholar | DPI Digital Library

How to Cite this Paper

  • IEEE Citation
  • MLA Citation
  • APA Citation
  • BibTex Citation
  • RIS Citation

IEEE Style Citation: Jameela Bano, L. S. S. Reddy, Hedi Khammari, “A Fuzzy based Fishbone Method for Goal-Oriented Requirements Analysis,” International Journal of Computer Sciences and Engineering, Vol.6, Issue.9, pp.699-704, 2018.

MLA Style Citation: Jameela Bano, L. S. S. Reddy, Hedi Khammari "A Fuzzy based Fishbone Method for Goal-Oriented Requirements Analysis." International Journal of Computer Sciences and Engineering 6.9 (2018): 699-704.

APA Style Citation: Jameela Bano, L. S. S. Reddy, Hedi Khammari, (2018). A Fuzzy based Fishbone Method for Goal-Oriented Requirements Analysis. International Journal of Computer Sciences and Engineering, 6(9), 699-704.

BibTex Style Citation:
@article{Bano_2018,
author = {Jameela Bano, L. S. S. Reddy, Hedi Khammari},
title = {A Fuzzy based Fishbone Method for Goal-Oriented Requirements Analysis},
journal = {International Journal of Computer Sciences and Engineering},
issue_date = {9 2018},
volume = {6},
Issue = {9},
month = {9},
year = {2018},
issn = {2347-2693},
pages = {699-704},
url = {https://www.ijcseonline.org/full_paper_view.php?paper_id=2930},
doi = {https://doi.org/10.26438/ijcse/v6i9.699704}
publisher = {IJCSE, Indore, INDIA},
}

RIS Style Citation:
TY - JOUR
DO = {https://doi.org/10.26438/ijcse/v6i9.699704}
UR - https://www.ijcseonline.org/full_paper_view.php?paper_id=2930
TI - A Fuzzy based Fishbone Method for Goal-Oriented Requirements Analysis
T2 - International Journal of Computer Sciences and Engineering
AU - Jameela Bano, L. S. S. Reddy, Hedi Khammari
PY - 2018
DA - 2018/09/30
PB - IJCSE, Indore, INDIA
SP - 699-704
IS - 9
VL - 6
SN - 2347-2693
ER -

VIEWS PDF XML
436 294 downloads 169 downloads
  
  
           

Abstract

Decision-making in requirements engineering plays a vital role in building quality software. Significant research is being applied in the requirements engineering field towards finding the reasons for high failure rates in software development. However, the industry still fails to produce quality requirements. Based on our literature review, we identifying that major contributing factor in getting a low rate of success is due unclear and imprecise requirements. In this paper, we proposed a novel fuzzy based fishbone method for decision making in Goal Oriented Requirements Engineering. It facilitates active stakeholder involvement in decision making process by integrating GORE with existing approaches in requirements engineering with respect to decision making. The main objective of this work is to present a formal framework to aid the decision making in a software development process, with ambiguous and vague data. GORE lays focus on the activities before the formulation of software system requirements. Finally, the proposed method improves the quality of decision making system and obtains high-quality products along with finer productivity.

Key-Words / Index Term

Requirements Engineering, Fuzzy set theory, Fishbone, GORE, Software quality

References

[1] Emilio Insfran, Gary Chastek, Patrick Donohoe and Julio César Sampaio,” Requirements engineering in software product line engineering”, Requirements Engineering, Volume 19, Issue 4, pp 331–332,2014.
[2] Chen, S.J., Hwang, C.L., 1992. Fuzzy Multiple Attribute Decision Making: Methods and Applications. Springer- Verlag, Berlin.
[3] Chu, T. C., & Lin, Y. C.,” Improved extensions of the TOPSIS for group decisionmaking under fuzzy environment. Journal of Information and Optimization Sciences, 23, 273–286, 2002.
[4] Van Lamsweerde,”Goal-Oriented Requirements Engineering: A Guided Tour”, Proc. 5th IEEE International Symposium on Requirements Engineering, Toronto, Canada, 2001.
[5] Chan, F. T. S., & Kumar, N.,”Global supplier development considering risk factors using fuzzy extended AHP-based approach”, OMEGA, 35, 417–431, 2007.
[6] Chen, C. T.,” Extensions of the TOPSIS for group decision-making under fuzzy environment”, Fuzzy Sets and Systems, 114, 1–9, 2000.
[7] Chen, S.J., Hwang, C.L., “Fuzzy Multiple Attribute Decision Making: Methods and Applications. Springer, 1992.
[8] Chen, T. Y., & Tsao, C. Y.,”The interval-valued fuzzy TOPSIS methods and experimental analysis”, Fuzzy Sets and Systems. doi:10.1016/j.fss.2007.11.004, 2007.
[9] Faulk S R, “Software Requirements in Software Engineering”, IEEE Computer Society Pres, 1997 .
[10] Metin Dag˘deviren, Serkan Yavuz, Nevzat Kılınç,”Weapon selection using the AHP and TOPSIS methods under fuzzy environment”, Expert Systems with Applications 36 8143–8151, 2009.
[11] Wang, Y. M., & Elhag, T. M. S. ,” Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment”, Expert Systems with Applications, 31, 309–319, 2006.
[12] Wang, J., Liu, S. Y., & Zhang, J.,” An extension of TOPSIS for fuzzy MCDM based on vague set theory”, Journal of Systems Science and Systems Engineering, 14, 73-84, 2005.